Implementation Of Geotextile- Evaporation Pound
Implementation Of Geotextile Evaporation Pound - Aug 2017
testing the climber of unit 1's cooling tower
testing the climber of unit 1's cooling tower - Aug 2017
Welding the internal pipes- Unit 1's Cooling Island
Welding the internal pipes- Unit 1's Cooling Island - Aug 2017
Inside view of unit 1's cooling tower
Inside view of unit 1's cooling tower - Aug 2017
Leveling the area of evaporation pond
Leveling the area of evaporation pond - Aug 2017
Landscaping around the guard house
Landscaping around the guard house, Water transmission project-Aug 2017
Installing the widenning roof- Unit 1's cooling tower
Installing the widenning roof- Unit 1's cooling tower - Aug 2017
Sand blasting the demin tank No.2
Sand blasting the demin tank No.2 - Aug 2017
Erection Of Turbine Hall-Unit 1
Erection Of Turbine Hall-Unit 1 - Aug 2017
End up the installing of tank
End up the installing of tank, MEDIA project- Aug 2017
Erection of trans. - Water transmission project
Erection of trans. , Water transmission project - Aug 2017
Erection of delta- cooling tower unit 1
Erection of delta- cooling tower unit 1 - Aug 2017
Enforcing the roof of Net. pit
Enforcing the roof of Net. pit - Aug 2017
Commissioning the MEDIA system
Commissioning the MEDIA system - Aug 2017
Completing the pump house- MEDIA project
Completing the pump house, MEDIA project - Aug 2017
Rain Water Pipe Spooling
Rain Water Pipe Spooling - Apr 2017