Rain Water Pipe Spooling
Rain Water Pipe Spooling - Apr 2017
Installation of 18th Ring Parts at Cooling No.1
Installation of 18th Ring Parts at Cooling No.1 - Apr 2017
Excavation For Tanks (Cooling No.1)
Excavation For Tanks (Cooling No.1) - Apr 2017
Compacting & Preparation of  roads
Compacting & Preparation of roads (Water Transmission Project)- Apr 2017
Electrical Panel Installation
Electrical Panel Installation (SwitchGear No.2) - Apr 2017
Diverter Damper Installation(Boiler NO.6)
Diverter Damper Installation(Boiler NO.6) - March 2017
Cooling Tower's Reservation tanks Installation
Cooling Tower's Reservation tanks Installation - March 2017
Oil injection to main Trans.
Oil injection to main Trans. - March 2017
Installation Of Cooling Tower Structures (unit 1 & 2)
Installation Of Cooling Tower Structures (unit 1 & 2) - March 2017
Installation of WTP Tanks
Installation of WTP Tanks - March 2017
Piping of Boiler No.1
Piping of Boiler No.1 - March 2017
Pipe Trench Excavation Toward WTP
Pipe Trench Excavation Toward WTP - March 2017
Overhaul of Unit G12
Overhaul of Unit G12 - March 2017
Water Transmission Project- Sandblasting and Coating of 500m3 Tank
Water Transmission Project- Sandblasting and Coating of 500m3 Tank - March 2017
Water Transsmission Project-Construction of Security Room
Water Transsmission Project-Construction of Security Room - March 2017
Overhaul of  Unit G12.
Overhaul of Unit G12. - March 2017